Legacy Engineering Ltd
Home Page
About Us - Company Info
References
Staff
Contact Us
Links
News
E.I.A.
Solid Waste Management
Wind Energy
LFG
Project News
Possible Future Projects in Turkey
You may find out latest information of projects on air or to be tendered in near future in Turkey, mainly on environmental issues and renewable energies

You may more info about the project writting to us
Izmir Metro II. Phase Tender
Total Line Length : 4.82 km.
5 Underground Stations
Deep Tunnel : 1040 m.
Open-Close Tunnel : 2800 m.
Station (Open-Close) : 980 m.
Station Peron Length : 125 m. (5 car line)
Maximum Speed : 80 km/h
Trade Speed : 40 km/h
Energy : 750 V DC
Feeding : from 3. Rail

Izmir- Subway Modernization

PROJECT FOR DEVELEOPMENT OF IZMIR SUB-URBAN SYSTEM ENGINEERING, CONSTRUCTION AND CONTROLLING SERVICES

The system to a high standard, high speed intercity railways transport system by the Municipality along the line of approximately 80 km between Aliaga-Cumaovasi stations.

Tender Type = Turn-key
Tendering by Izmir Metropolitan Municipality