Izmir Metro II. Phase Tender
Total Line Length : 4.82 km.
5 Underground Stations Deep Tunnel : 1040 m. Open-Close Tunnel : 2800 m. Station (Open-Close) : 980 m. Station Peron Length : 125 m. (5 car line)
Maximum Speed : 80 km/h Trade Speed : 40 km/h Energy : 750 V DC Feeding : from 3. Rail
Izmir- Subway Modernization
PROJECT FOR DEVELEOPMENT OF IZMIR SUB-URBAN SYSTEM ENGINEERING, CONSTRUCTION AND CONTROLLING SERVICES
The system to a high standard, high speed intercity railways transport system by the Municipality along the line of approximately 80 km between Aliaga-Cumaovasi stations.
Tender Type = Turn-key
Tendering by Izmir Metropolitan Municipality
|